Denso RC5 Specifiche Pagina 119

  • Scaricare
  • Aggiungi ai miei manuali
  • Stampa
  • Pagina
    / 182
  • Indice
  • SEGNALIBRI
  • Valutato. / 5. Basato su recensioni clienti
Vedere la pagina 118
99
When issued with the Operation Preparation Start
The figure below shows the input conditions and an operation timing
chart.
Input Program Reset before Operation Preparation Start (1 msec. or
more).
After turned ON, this signal may take a maximum of one second for
initializing all programs. During the period, do not input signals to the
robot.
Input Conditions and Operation of Program Reset Signal
Vedere la pagina 118
1 2 ... 114 115 116 117 118 119 120 121 122 123 124 ... 181 182

Commenti su questo manuale

Nessun commento